Valsad

Vapi–Valsad Route to Face Rail Disruptions on October 18, Two Trains Cancelled

By GS Team
15 Oct 20261 min read
TukuTouch Logo
Vapi-Valsad railway passengers face disruptions on October 18 due to Western Railway's ROB girder-launching work. A 10 am-12:30 pm block affects main and loop lines. Two trains are cancelled, two Vadodara-Dadar services will terminate/originate at Valsad, and the Borivali-Valsad train ends at Bhilad. Expect potential delays; check schedules.

Summarized by AI; it may make mistakes. Check important info

Vapi–Valsad Route to Face Rail Disruptions on October 18, Two Trains Cancelled
Image : AI Generated Representative image

Railway passengers travelling between Vapi and Valsad on October 18 should prepare for service disruptions as Western Railway undertakes girder-launching work for a road overbridge (ROB). A block will be imposed from 10 am to 12.30 pm, affecting the up and down main lines and the down loop line. Two trains will be cancelled, two others will have their terminal stations changed, and another service will terminate early.

Two Trains Cancelled on October 18

The following passenger trains will remain cancelled for the day:

  • Train No. 69154 (Valsad–Umargam Road): Cancelled on October 18.
  • Train No. 69153 (Umargam Road–Valsad): Cancelled on October 18.

Vadodara–Dadar Trains to Have Changed Terminals

The terminal stations of two trains will be changed due to the block:

  • Train No. 22930 (Vadodara–Dadar): The train will terminate at Valsad instead of Dadar on October 18.
  • Train No. 22929 (Dadar–Vadodara): The train will originate from Valsad instead of Dadar on October 18.

Borivali–Valsad Train to End Journey at Bhilad

Train No. 69139 (Borivali–Valsad) will run only up to Bhilad on October 18, instead of its scheduled destination, Valsad.

Western Railway has advised passengers to check official railway updates and train schedules before setting out, as the block could also delay other services.