India

Siddhpur Railway Station: Stoppage Of 13 Trains Cancelled From September 30 To November 13

By GS Team
30 Sep 20262 mins read
TukuTouch Logo
Siddhpur railway station will temporarily cancel stops for 13 trains between September 29 and November 13 due to ongoing platform modernization. Ahmedabad Division is extending and raising Platform No. 2, necessitating the change for passenger safety. Travelers should note the affected trains will bypass Siddhpur during this period.

Summarized by AI; it may make mistakes. Check important info

Siddhpur Railway Station: Stoppage Of 13 Trains Cancelled From September 30 To November 13
AI Image

The stoppage of 13 trains at Siddhpur railway station on the Ahmedabad–Palanpur section has been temporarily cancelled in view of ongoing platform modernisation work.

The Ahmedabad Division has begun engineering work to extend Platform No. 2 by 70 metres at both ends and raise its height. To ensure passenger safety during the construction, the stoppage of selected trains in the down direction has been withdrawn for specified periods.

The cancellations will apply between September 30 and November 13, depending on the train.

List Of Trains Skipping Siddhpur

Train No.
Train
Period Of No Stoppage
14702
Bandra Terminus–Shri Ganganagar Aravali Express
September 29 to November 12
14822
Gandhigram–Jodhpur Express
September 30 to November 13
19411
Gandhinagar Capital–Daulatpur Chowk Express
September 30 to November 13
19223
Sabarmati–Jammu Tawi Express
September 30 to November 13
19031
Sabarmati–Yog Nagari Rishikesh Express
September 30 to November 13
79437
Mehsana–Abu Road DEMU
September 30 to November 13
20694
KSR Bengaluru–Jodhpur Bi-weekly Express
September 29 to November 12
20951
Okha–Jaipur Weekly Express
October 5 to November 9
19565
Okha–Dehradun Express
October 2 to November 13
22915
Bandra Terminus–Hisar Superfast Express
October 5 to November 9
20496
Hadapsar–Jodhpur Express
October 4 to October 9
12548
Gandhigram–Agra Cantt Express
October 5 to October 8
19409
Sabarmati–Thawe Express
October 8 and October 10

Platform Extension Work Underway

The engineering work involves extending Platform No. 2 by 70 metres at both ends, along with raising the platform height as part of the station's modernisation.

Railway authorities have decided to withdraw the Siddhpur halt for the affected trains during the work to prioritise passenger safety.

Passengers travelling on these services during the specified dates are advised to take note of the temporary change, as the affected trains will not stop at Siddhpur station during the respective periods.