Cracks Appear on ₹66 Crore Bridge in Bharuch Within 100 Days of Inauguration
Summarized by AI; it may make mistakes. Check important info
Summarized by AI; it may make mistakes. Check important info

A major controversy has emerged over the construction quality of the Doliya-Denva Bridge in Gujarat’s Bharuch district after large cracks appeared on its road within just 100 days of its inauguration. Built at a cost of ₹66 crore by Mehsana-based Radhe Associates, the bridge connects Jambusar and Amod talukas. Cracks have started appearing on its RCC road surface, raising concerns among local residents over the quality of construction and allegations of possible corruption. Residents have expressed anger and questioned how a newly inaugurated bridge could develop such serious damage within such a short period.
Questions Raised Over Construction Quality and Fitness Certificate
The incident has also raised questions about the officials who inspected the bridge and issued its fitness certificate. Residents and critics have questioned whether a proper site inspection was carried out before the certificate was given. Allegations of poor-quality materials and possible links between the contractor and officials have also surfaced. However, these allegations have not been independently established.
People fear that if the bridge has developed cracks within 100 days, its condition could become worse in the coming months. The issue has led to public anger, with residents questioning how public money worth crores of rupees has been spent on a project that is already showing signs of damage.
Congress Leader Raises Voice Against the Issue
Former Congress MLA Kiran Singh Makwana has strongly opposed the alleged poor construction work. People have also warned of launching a protest over the matter. They are demanding accountability from the contractor and the officials responsible for approving the project.
The report also mentions earlier cases of alleged poor-quality construction in Bharuch district. These include the Ankleshwar ONGC Bridge, a road in Andada village, the Bhukhi creek culvert in Pariej village, which reportedly broke within a month of its inauguration, and the Amod-National Highway 64 stretch, which was damaged during the monsoon. These incidents have increased concerns about the quality of public infrastructure projects in the district.