Vadaj Bridge Opens, New Cut Near Aroma College Brings Relief To 12,000 Daily Commuters Within 48 Hours
Summarized by AI; it may make mistakes. Check important info
Summarized by AI; it may make mistakes. Check important info

A new road cut near Aroma College has been opened within 48 hours of the Vadaj overbridge becoming operational, easing the route for motorists travelling from Vadaj towards Naranpura.
The Ahmedabad Municipal Corporation and traffic police took the decision after the closure of the existing cut forced motorists to take a detour via Usmanpura.
The new cut, located around 200 metres ahead of the old one, is expected to benefit around 10,000 to 12,000 motorists every day, particularly two-wheeler riders.
Old Cut Closure Led To Traffic Issues
Chief Minister Bhupendra Patel inaugurated the Vadaj overbridge and opened it to traffic on September 24.
The cut connecting Vadaj towards Naranpura at the end of the bridge was subsequently closed as part of traffic safety and management measures.
Following the closure, motorists heading towards Naranpura had to travel up to the Usmanpura signal to take a U-turn or use a longer detour. The change led to complaints from local residents and regular commuters.
Two-Day Traffic Survey Conducted
The traffic police conducted a two-day survey after the cut was closed to assess traffic movement and the difficulties faced by motorists.
The survey found increased traffic towards Usmanpura and inconvenience for commuters travelling between Vadaj and Naranpura.
Following the assessment, the traffic police and AMC decided to provide an alternative connection closer to the bridge.
New Cut Opened Overnight
Officials from the traffic police and AMC held an urgent meeting to finalise the location and arrangements for the new cut.
The cut was opened overnight near Aroma College, with signboards installed to guide motorists using the alternative route.
The new connection allows vehicles travelling from Vadaj towards Naranpura to avoid the Usmanpura detour.
1.5 Lakh Vehicles Expected To Use Vadaj Bridge Daily
Around 1.5 lakh vehicles are expected to pass over the Vadaj overbridge every day.
With such a high volume of traffic, officials are focusing on alternative connections around the bridge to prevent congestion on adjoining roads.
The new cut is expected to provide immediate relief to the 10,000 to 12,000 motorists who travel towards Naranpura each day.
AMC And Police Respond To Commuter Concerns
The decision to open the new cut came after local residents and regular commuters raised concerns over the inconvenience caused by the closure of the earlier route.
After the traffic survey and an urgent coordination meeting, the AMC and traffic police completed the alternative connection within two days of the bridge becoming operational.