Ahmedabad

RTO Circle BRTS Stand Removed for Bridge Work, Commuters Face Six-Month Wait in the Open

By GS Team
21 Nov 20262 mins read
TukuTouch Logo
Ahmedabad's RTO Circle BRTS stand is dismantled for bridge expansion, leaving commuters without shelter for six months. A temporary roadside stop near the new RTO building will serve passengers during construction of the Subhash and Chimanbhai Patel bridges. The project aims to streamline traffic, with future plans for permanent sheltered bus stands under consideration.

Summarized by AI; it may make mistakes. Check important info

RTO Circle BRTS Stand Removed for Bridge Work, Commuters Face Six-Month Wait in the Open

Daily commuters travelling through Ahmedabad's RTO Circle will have to wait on the roadside under the open sun for the next six months after civic authorities dismantled the existing BRTS bus stand to make way for bridge expansion work.

The passenger facility near RTO Circle was removed ahead of construction on Subhash Bridge and Chimanbhai Patel Bridge, which includes building a new wing towards Subhash Bridge. In its place, authorities have set up a temporary cabin near the gate of the new RTO building, leaving passengers without proper shelter against heat and rain until the project concludes.

Revised Route and Boarding Point for Commuters

Rahul Sharma, who holds charge of the BRTS department, confirmed that work on Chimanbhai Patel Bridge has already commenced. The bridge project department had written to the BRTS wing requesting the removal of the RTO Circle stand so construction would not be obstructed.

Under the revised arrangement, BRTS buses arriving from Chandkheda and Zundal will descend from Chimanbhai Patel Bridge, turn towards Subhash Bridge Circle, and halt near the temporary cabin outside the new RTO building gate. Commuters on these routes will now have to board and alight at this makeshift stop along the road for the next six months.

Structural Changes to Ease Traffic Movement

According to an official from the bridge project department, preliminary work—including the inspection of utility lines—is currently underway at the site. As part of the redesign, the section of the bridge near RTO Circle will be modified and shortened.

Once the new wing is completed, vehicles heading towards Akhbarnagar will be able to pass straight through, while a separate wing will channel traffic towards Subhash Bridge. Authorities expect this reconfiguration to alter and streamline traffic flow around the busy RTO junction.

Long-Term Plans for BRTS and AMTS Stands

Civic officials are considering permanent transit infrastructure for both BRTS and AMTS commuters once the bridge expansion wraps up. Under current proposals, buses bound for Akhbarnagar may be routed towards Subhash Bridge to turn via the circle rather than travelling straight ahead.

Plans are also on the table to construct a new bus stand near Subhash Bridge alongside a permanent BRTS station beneath the bridge at RTO Circle. If implemented, the setup would restore proper sheltered boarding facilities at both junctions. Until then, however, daily riders remain dependent on the roadside temporary cabin outside the new RTO building.