Direct Trains from Vatva to Ambaji Soon? Varetha–Abu Rail Line Work Hits Top Gear
Summarized by AI; it may make mistakes. Check important info
Summarized by AI; it may make mistakes. Check important info

AHMEDABAD — Lakhs of devotees heading to the Ambaji shrine will soon have direct rail access, as construction on the new Varetha–Ambaji and Ambaji–Abu Road railway lines progresses rapidly. Parts of the new corridor are already lined up for a Commissioner of Railway Safety (CRS) inspection, setting the stage for seamless train travel from Ahmedabad straight to the temple town.
Ahmedabad Divisional Railway Manager (DRM) Ved Prakash shared the update at Vatva railway station while flagging off the extension of the Varetha–Gandhinagar Capital MEMU service (train numbers 69208/69207) up to Vatva. He confirmed that once the Varetha–Ambaji stretch is completed, railways will be able to extend this MEMU train directly to Ambaji.
How the Varetha–Ambaji–Abu Line Will Reshape Regional Travel
Rail connectivity currently terminates at Varetha on the Mahesana route. Bridging the gap from Varetha to Ambaji and onward to Abu Road will transform travel across Gujarat and Rajasthan:
- Direct, affordable access for devotees: Pilgrims from Ahmedabad, Gandhinagar, and across North Gujarat will get a low-cost, comfortable direct train option to visit Maa Ambaji.
- Boost to cross-border tourism: Linking Ambaji and Abu Road by rail will strengthen religious tourism and leisure travel between Gujarat and Rajasthan.
- Stronger daily commuter links: With the MEMU now extended to Vatva, students, office-goers, traders, and daily passengers from Varetha, Vadnagar, Visnagar, Mahesana, and Kalol gain direct rail connectivity to Chandkheda Road, Sabarmati, Ahmedabad, Maninagar, and Vatva.
- More coaches on the cards: The MEMU service currently runs with eight coaches, though railway authorities plan to evaluate adding more coaches as passenger numbers grow and the Ambaji extension opens.
Current Timings for the Vatva–Varetha MEMU Service
The extended service commenced operations from Vatva on November 29, 2026, in the presence of local MPs, MLAs, and railway officials.
- Train No. 69207 (Vatva to Varetha): Departs Vatva at 17:10 hrs and arrives in Varetha at 21:30 hrs (effective November 29, 2026).
- Train No. 69208 (Varetha to Vatva): Departs Varetha at 06:15 hrs and reaches Vatva at 10:45 hrs (effective November 30, 2026).