Ahmedabad

Ahmedabad’s ₹43-Crore Mansi Circle–Himalaya Mall Road Project Put on Hold Over Traffic, Parking Concerns

By GS Team
21 Oct 20263 mins read
TukuTouch Logo
Ahmedabad's ₹43-crore road project from Mansi Circle to Himalaya Mall is on hold for review. Citing fears of reduced road width, increased congestion, and drainage issues, the AMC committee is re-evaluating the design, including footpaths, landscaping, and parking. Financials are also under scrutiny, with the tender 18.69% above estimates. This aims to prevent past project issues and ensure optimal traffic flow and value for money.

Summarized by AI; it may make mistakes. Check important info

Ahmedabad’s ₹43-Crore Mansi Circle–Himalaya Mall Road Project Put on Hold Over Traffic, Parking Concerns
AI-IMAGE

Ahmedabad Municipal Corporation has put its proposed ₹43-crore road development project between Mansi Circle and Himalaya Mall on hold for further study, amid fears that the plan could reduce road width and worsen traffic congestion.

The project, spanning around 2.5 to 3 km through Shahid Chowk near Vastrapur Lake and Sanjeevani Hospital in Bodakdev ward, was proposed for development as a precinct area with footpaths, landscaping and designated parking on both sides.

Janik Vakil, chairman of the AMC’s Road and Building Committee, returned the proposal for a detailed review before granting approval.

Read Here: Taxpayer Money Down the Drain: AMC Set to Repeat Failed Mithakhali Road Model at Mansi Circle for ₹43 Crores

Mithakhali Road Experience Prompts Caution

The decision follows concerns over a similar road development project on the stretch from Mithakhali Six Roads past Girish Cold Drinks to Wagh Bakri Tea Lounge. Work on that road had earlier been halted amid concerns over reduced road width before eventually resuming.

Officials want to avoid a repeat of the situation on the Mansi Circle–Himalaya Mall stretch, where additional pedestrian facilities, landscaping and parking could affect the space available for moving vehicles.

With vehicle numbers rising across Ahmedabad, the administration must assess whether the proposed improvements will ease congestion or leave motorists with less usable road space.

Road Width, Drainage and Parking Under Review

The review will examine the proposed road width, traffic movement, parking arrangements and stormwater drainage before the project moves forward.

Officials will also assess whether raising the road level could obstruct rainwater drainage during the monsoon and whether the proposed parking facilities could create bottlenecks.

The key question is whether the project will deliver tangible benefits to motorists alongside improving pedestrian infrastructure and the road’s appearance.

Tender Cost 18.69% Above AMC Estimate

The financial aspect of the proposal has also come under scrutiny. Devers Construction Company’s revised tender rate is reportedly 18.69% higher than the estimate prepared by the AMC’s Engineering Department.

The committee has called for a comparison with similar road projects undertaken elsewhere in the zone to determine whether the proposed expenditure is justified.

With the project estimated to cost around ₹43 crore, the administration wants clarity on both the design and the value for money before proceeding.

Final Decision After Detailed Study

The proposal will remain on hold until the relevant aspects have been examined. The AMC will then decide whether to approve the project and what changes, if any, are required.

The review will determine whether the Mansi Circle–Himalaya Mall road can accommodate wider pedestrian facilities, landscaping and parking without compromising traffic flow or stormwater drainage.